Based on an overall plan, the new engine plant will be realized phase by phase.?Phase one starts construction in 2013 and starts production in 2016. It will provide the latest BMW engine products to the local production models?with a planned production capability of 400,000 units per year.

          Location: Shenyang, China
          Assignment type: Commission
          Type of project: MEP, Structural Design
          Project duration: 2012 - 2016
          GFA: 153900 m2
          精油按摩强奷完整视频,国产精品久久自在自线,国产高清成免费视频,亚洲av综合av一区,在线点播亚洲日韩国产欧美,换爱交换乱理伦片中文字幕,日本阿v不卡高清在线播放