OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center
          OBERMEYER - BMW e-center

          After three months of intense architectural design and coordination with BMW Beijing, OBERMEYER submitted the much anticipated concept design of BMW's new R&D Center in Beijing. The 25,000 square meters building complex will comprise a workshop area of 6,000 square meters, two levels of office space for 350 employees, a canteen, social staff areas as well as a car parking building for 250 cars. The center will be used by BMW to test concept cars as well as adopt building parts to the fast growing Chinese market. In the submitted concept design, the rather confidential function of the workshop is kept as a dark, rough box supporting the shiny, glossy double leveled office bar elevated to top. The four-story car park towards the elevated highway provides shelter and privacy from the outside, whereas the office levels focus towards the green and lush golf course in the south.

          Location: Beijing, China
          Assignment type: Commission
          Design Phases: Conceptual Design
          Type of project: Industrial Buildings, Office Buildings
          Project duration: 2014
          GFA: 25000 m2
          精油按摩强奷完整视频,国产精品久久自在自线,国产高清成免费视频,亚洲av综合av一区,在线点播亚洲日韩国产欧美,换爱交换乱理伦片中文字幕,日本阿v不卡高清在线播放