The concept focused on embedding the new development in the given topography that allows minimizing necessary earthwork and protecting ecological resources. Thus an intensive GIS analysis was the offspring for the resulting infrastructure and the urban massing. Considering factors like slope, slope direction, noise, water-shed and environment, the plan has an over-average green rate of 25% dedicated to parks and water bodies. The buildings are grouped into 7 sub-set (Beidou is the name for the star constellation of the Great Bear with 7 stars) and collected requirements of all functions. Along the main axis 4 central areas are represented by high-rise structures. All other functions are grouped in efficient mid to low-rise structures, whereas the research areas were organized in campus schemes. In order to cope with the 5 to 7 years developing period of the planned 1.35 million m2 of gross floor area the realization schedule is divided into 5 functional sub-plots, where the first development zone will receive functions from the whole program and the following zones will comprehend the functions logically. Zones for working and areas for living and leisure were treated in the OBERMEYER concept with equal importance. Upon completion the Beidou Industrial Park shall integrate Productive,- working, studying, researching and living by a comprehensive approach.

          Location: Ganzhou, China
          Assignment type: Competition
          Design Phases: Conceptual Planning
          Type of project: Business + Industrial Park
          Project duration: 2014
          Program: 1st Prize at International Competition
          Area: 890000 m2
          精油按摩强奷完整视频,国产精品久久自在自线,国产高清成免费视频,亚洲av综合av一区,在线点播亚洲日韩国产欧美,换爱交换乱理伦片中文字幕,日本阿v不卡高清在线播放