In 1991 OBERMEYER was assigned to design a second passenger terminal for the expanding Leipzig–Halle Airport. Terminal 2 has a capacity of 3.5 million passengers per year, including the functions arrival, departure, luggage handling and areas for communication and conferences. Significant for this terminal is the distinguished design concept, optimal functionality, ideal orientation, short ways, 6 passenger bridges, large-scale steel constructions and voluminous spaces. Three years after construction the client confirmed the optimal functionality and the high cost-effectiveness of the terminal.

          Location: Leipzig, Germany
          Assignment type: Commission
          Design Phases: Detailed Planning
          Type of project: Train Stations + Airports
          Project duration: 1994 - 1996
          GFA: 25000 m2
          精油按摩强奷完整视频,国产精品久久自在自线,国产高清成免费视频,亚洲av综合av一区,在线点播亚洲日韩国产欧美,换爱交换乱理伦片中文字幕,日本阿v不卡高清在线播放