The transformation of the old Munich airport into the New Munich Trade Fair Centre was the biggest construction project in Munich since the Olympic Games in 1972. Upon completion of the overall complex, the New Trade Fair Centre in Munich offers an exhibition area of 200,000 m2. On the halls, there is the largest photovoltaic installation in Europe at that time. The stringent axial structure of the trade fair complex with its uniform subdivision of the halls along a central axis running from east to west, the “Atrium”, affords clear orientation for exhibitors, operators and guests. The linear main structure distinctly defines the entrances on the narrow sides. Ice storage, district heating, photovoltaic system are designed to aim at DGNB certification.

          Location: Munich, Germany
          Assignment type: Commission
          Design Phases: Overall Planning, Schematic Design
          Type of project: Trade Fairs
          Project duration: 1991 - 2016
          GFA: 200000 m2
          Certificates: DGNB
          精油按摩强奷完整视频,国产精品久久自在自线,国产高清成免费视频,亚洲av综合av一区,在线点播亚洲日韩国产欧美,换爱交换乱理伦片中文字幕,日本阿v不卡高清在线播放